Bondi · Eastern Suburbs

From plan to pack-down, we handle swept path analysis in Bondi. Campbell Pde beachfront — Festival of the Winds, City2Surf finish and summer clearways — so schemes are designed for the real road environment, approved by the right authorities and delivered safely.

What's included

Access, loading & docks Intersection & roundabout checks Design-vehicle compliance

AutoTURN and Vehicle Tracking checks to AS 2890 and Austroads design vehicles — from B-doubles to refuse trucks. In Bondi we run AutoTURN and Vehicle Tracking checks so access, loading and docks work for the intended design vehicles. See the full Swept Path Analysis service, or browse all traffic management in Bondi.

Traffic management in Bondi

Campbell Parade's beachfront strip faces some of Sydney's most intense seasonal traffic pressure, with clearway restrictions, summer overflow from the beach car parks, and major crowd events including the Festival of the Winds and City2Surf finish all requiring coordinated road closures and pedestrian-flow management. The constrained road network between the beach and Old South Head Road leaves little room for error, making thorough council permits and site-specific traffic-management plans essential.

Get in touch

Need swept path analysis in Bondi?

Tell us about the site, the dates and what you need — we'll come back with a plan.