Coffs Harbour · Regional NSW
We handle swept path analysis in Coffs Harbour, from the first plan to the final pack-down. Pacific Highway bypass, Harbour Drive, Coffs Harbour Stadium and Big Banana tourist precinct. Schemes are designed for the real road environment, approved by the right authorities and delivered safely.
What's included
AutoTURN and Vehicle Tracking checks against AS 2890 and Austroads design vehicles, for everything from B-doubles to refuse trucks. Swept path checks for Coffs Harbour confirm that service vehicles, B-doubles and refuse trucks can access and turn within the site to AS 2890 and Austroads. See the full Swept Path Analysis service, or browse all traffic management in Coffs Harbour.
Traffic management in Coffs Harbour
The Pacific Highway bypass has reshaped traffic distribution through Coffs Harbour, but Harbour Drive and the coastal precinct roads still carry significant volumes of tourist and local traffic to the marina, Big Banana tourist precinct, and Coffs Harbour Stadium. Event traffic for concerts and sporting fixtures at the stadium, combined with seasonal tourist peaks along Harbour Drive, generates recurring demand for traffic-management plans that coordinate with Coffs Harbour City Council and account for the limited grade-separated crossings between the highway bypass and the coastal strip.
Recent work near Coffs Harbour
FAQ
Swept Path Analysis — common questions
What standards do your traffic management documents follow?
In NSW, temporary traffic management documents are prepared to the Transport for NSW Traffic Control at Work Sites (TCAWS) manual, which supplements Australian Standard AS 1742.3 (traffic control for works on roads). Swept-path and vehicle-access checks reference the AS 2890 series and Austroads design vehicles. We prepare TGS and TMP documents to these current standards through PWZTMP-accredited designers.
What is a Traffic Guidance Scheme (TGS)?
A TGS is a site-specific, to-scale diagram that shows exactly where every advance-warning sign, cone, barrier, taper and traffic controller goes around a work zone or event. In NSW it replaced the older term Traffic Control Plan (TCP), and a compliant TGS is drawn to the TfNSW TCAWS manual and AS 1742.3.
Who is legally allowed to prepare a TGS or TMP in NSW?
Only a person holding the SafeWork NSW Prepare a Work Zone Traffic Management Plan (PWZTMP) accreditation can legally design or modify a TGS or TMP, and a compliant TGS carries the accredited designer's name and TfNSW certification details. On the road, Traffic Controller (TCR) card-holders direct traffic and Traffic Plan Implementer (IMP) card-holders set up and pack down the scheme — different cards for different jobs.
Get in touch
Need swept path analysis in Coffs Harbour?
Tell us about the site, the dates and what you need — we'll come back with a plan.