Concord · Inner West
Planning council permits & approvals in Concord? Traffic Consultants designs the scheme, secures the approvals and runs the crews on the road. Concord Road, Patterson Street and Concord Hospital access route management. That's the kind of local road environment we plan around across the Inner West.
What's included
We get the road occupancy licences and council approvals your project needs, and deal with each agency so your works or event are cleared to go ahead. Permits in Concord mean Road Occupancy Licences, Local Traffic Committee endorsement and Roads Act closures. We manage each agency so the job is cleared to proceed. See the full Council Permits & Approvals service, or browse all traffic management in Concord.
Traffic management in Concord
Concord Road serves as a critical north-south arterial through the inner west, carrying high volumes of traffic that make lane reductions for works particularly impactful during peak periods. Patterson Street and the access routes to Concord Hospital require meticulous traffic management planning to ensure emergency and patient vehicles maintain clear passage at all times, while residential streets flanking the hospital precinct must be protected from construction vehicle overflow.
Recent work near Concord
FAQ
Council Permits & Approvals — common questions
What is a Road Occupancy Licence (ROL) and when do I need one?
A Road Occupancy Licence is formal Transport for NSW approval to occupy or affect the state (classified) road network. You generally need one to work on a state road, within 100 m of traffic signals, or wherever works affect traffic flow, queues or safety on a state road. Council-controlled local roads are approved by the council instead, and the ROL application must match your TGS.
What's the difference between work on a local road and a classified (state) road?
The road type decides who approves you. Works on a council-controlled local road are approved by that council, often through a Local Traffic Committee. Works on a classified (state) road, or within 100 m of traffic signals, require a Transport for NSW Road Occupancy Licence via the OPLINC system. Many jobs touch both, so the approval path has to be mapped before work starts.
How long does approval take?
Transport for NSW advises Road Occupancy Licence applications are processed within about 10 business days of submission. Council approval of a TGS typically runs around 10-14 business days and can extend to about 28 days or more if state-managed roads or TfNSW are involved. Complex or non-compliant submissions take longer, so a correct site-specific plan the first time is the fastest path. These are current authority guidelines, not guarantees.
Do I need a Traffic Management Plan for my project or event?
You generally need a TMP or CTMP whenever works or an event will affect how traffic, pedestrians or cyclists move on a public road — for example lane or road closures, footpath closures, or construction traffic entering a busy street. For construction a CTMP is frequently a condition of development consent; for events a TMP is required if you're closing or significantly affecting public roads. If unsure, a quick site review will confirm which document your job needs.
Get in touch
Need council permits & approvals in Concord?
Tell us about the site, the dates and what you need — we'll come back with a plan.