Edgecliff · Eastern Suburbs

Traffic Consultants delivers swept path analysis across Edgecliff and the wider Eastern Suburbs. New South Head Road, Edgecliff Centre, Edgecliff Station bus-rail interchange. We prepare the documentation, obtain the permits and put accredited people on site.

What's included

Access, loading & docks Intersection & roundabout checks Design-vehicle compliance

AutoTURN and Vehicle Tracking checks to AS 2890 and Austroads design vehicles — from B-doubles to refuse trucks. Swept path checks for Edgecliff confirm that service vehicles, B-doubles and refuse trucks can access and turn within the site to AS 2890 and Austroads. See the full Swept Path Analysis service, or browse all traffic management in Edgecliff.

Traffic management in Edgecliff

New South Head Road passes through Edgecliff as a heavily used arterial linking the eastern suburbs to the CBD, with the Edgecliff Centre and the adjacent bus-rail interchange creating a high-frequency pedestrian environment at the Edgecliff Station precinct. Utility works, building-construction crane lifts and loading activity along this corridor require carefully timed lane occupancy arrangements that protect both bus operations and pedestrian access.

Get in touch

Need swept path analysis in Edgecliff?

Tell us about the site, the dates and what you need — we'll come back with a plan.