Planning construction traffic management in Gungahlin? Traffic Consultants designs the scheme, secures the approvals and runs the crews on the road. Gungahlin Drive, Horse Park Drive, Flemington Road light-rail corridor and Gungahlin Town Centre. That's the kind of local road environment we plan around across the ACT.

What's included

Work-zone traffic to TCAWS Lane & road closures Pedestrian management & hoarding Site access & deliveries

Work-zone traffic, lane and road closures, and pedestrian management for civil and building works. We write the Construction Traffic Management Plan your consent requires, then put crews on site to run it. For civil and building works in Gungahlin, we plan the work-zone scheme and put accredited crews on site to run it. See the full Construction Traffic Management service, or browse all traffic management in Gungahlin.

Traffic management in Gungahlin

Gungahlin Drive, Horse Park Drive, and Flemington Road form the arterial framework of one of Canberra's fastest-growing districts, with the light-rail corridor along Flemington Road adding a tram-pedestrian interface that must be respected in any works affecting kerbside lanes or shared paths. Gungahlin Town Centre's ongoing commercial expansion generates construction traffic that requires ACT Government works-approvals, and the area's high proportion of active and public transport users makes pedestrian and cyclist management a priority component of any traffic plan.

FAQ

Construction Traffic Management — common questions

Do I need a Traffic Management Plan for my project or event?

You generally need a TMP or CTMP whenever works or an event will affect how traffic, pedestrians or cyclists move on a public road — for example lane or road closures, footpath closures, or construction traffic entering a busy street. For construction a CTMP is frequently a condition of development consent; for events a TMP is required if you're closing or significantly affecting public roads. If unsure, a quick site review will confirm which document your job needs.

What's the difference between a TGS, a TMP and a CTMP?

A TMP is the high-level document that explains why and how a project affects the road network and sets the controls; a TGS is the diagram showing where each device and controller is placed and usually sits inside the TMP; a CTMP is a TMP written for a construction site and is commonly a condition of a Development Approval. The TMP says why and how, the TGS shows exactly where, and a CTMP is the construction version of a TMP.

What is a Road Occupancy Licence (ROL) and when do I need one?

A Road Occupancy Licence is formal Transport for NSW approval to occupy or affect the state (classified) road network. You generally need one to work on a state road, within 100 m of traffic signals, or wherever works affect traffic flow, queues or safety on a state road. Council-controlled local roads are approved by the council instead, and the ROL application must match your TGS.

Why was a generic or template traffic plan rejected by council?

Generic templates are one of the most common reasons councils reject a submission, because they don't show the real site-specific detail — exact clearances, bus zones, driveways, fire hydrants, school-crossing locations and local constraints. NSW councils require a plan drawn for your specific site by an accredited designer to TCAWS and AS 1742.3, so replacing a template with a site-specific TGS is usually what gets an application approved.

Get in touch

Need construction traffic management in Gungahlin?

Tell us about the site, the dates and what you need — we'll come back with a plan.

Site plan, brief or photos — PDF, image, DOC, DWG or ZIP (max 5MB).