Hurstville · Southern Sydney

Planning swept path analysis in Hurstville? Traffic Consultants designs the scheme, secures the approvals and runs the crews on the road. Forest Rd / Princes Hwy St George commercial hub and rail interchange. That's the kind of local road environment we plan around across the Southern Sydney.

What's included

Access, loading & docks Intersection & roundabout checks Design-vehicle compliance

AutoTURN and Vehicle Tracking checks against AS 2890 and Austroads design vehicles, for everything from B-doubles to refuse trucks. In Hurstville we run AutoTURN and Vehicle Tracking checks so access, loading and docks work for the intended design vehicles. See the full Swept Path Analysis service, or browse all traffic management in Hurstville.

Traffic management in Hurstville

Forest Road and the Princes Highway intersection forms the commercial heart of St George, where high pedestrian volumes, bus interchange activity and heavy goods vehicle movements combine to create one of Sydney's busier suburban traffic environments. Ongoing retail and mixed-use development around Hurstville Station adds construction traffic management requirements to an already demanding network, and council permit coordination is routinely needed for utility upgrades, streetscape works and community events along the main strip.

FAQ

Swept Path Analysis — common questions

What standards do your traffic management documents follow?

In NSW, temporary traffic management documents are prepared to the Transport for NSW Traffic Control at Work Sites (TCAWS) manual, which supplements Australian Standard AS 1742.3 (traffic control for works on roads). Swept-path and vehicle-access checks reference the AS 2890 series and Austroads design vehicles. We prepare TGS and TMP documents to these current standards through PWZTMP-accredited designers.

What is a Traffic Guidance Scheme (TGS)?

A TGS is a site-specific, to-scale diagram that shows exactly where every advance-warning sign, cone, barrier, taper and traffic controller goes around a work zone or event. In NSW it replaced the older term Traffic Control Plan (TCP), and a compliant TGS is drawn to the TfNSW TCAWS manual and AS 1742.3.

Who is legally allowed to prepare a TGS or TMP in NSW?

Only a person holding the SafeWork NSW Prepare a Work Zone Traffic Management Plan (PWZTMP) accreditation can legally design or modify a TGS or TMP, and a compliant TGS carries the accredited designer's name and TfNSW certification details. On the road, Traffic Controller (TCR) card-holders direct traffic and Traffic Plan Implementer (IMP) card-holders set up and pack down the scheme — different cards for different jobs.

Get in touch

Need swept path analysis in Hurstville?

Tell us about the site, the dates and what you need — we'll come back with a plan.

Site plan, brief or photos — PDF, image, DOC, DWG or ZIP (max 5MB).