Leppington · Macarthur
Traffic Consultants delivers swept path analysis across Leppington and the wider Macarthur. Bringelly Road, Leppington Road, and South West Rail Link station precinct. We prepare the documentation, obtain the permits and put accredited people on site.
What's included
AutoTURN and Vehicle Tracking checks against AS 2890 and Austroads design vehicles, for everything from B-doubles to refuse trucks. In Leppington we run AutoTURN and Vehicle Tracking checks so access, loading and docks work for the intended design vehicles. See the full Swept Path Analysis service, or browse all traffic management in Leppington.
Traffic management in Leppington
Leppington is one of South West Sydney's fastest-growing precincts, with Bringelly Road and Leppington Road both undergoing staged upgrades to accommodate the residential and commercial development flowing from the South West Rail Link station. New collector roads, roundabout constructions, and subdivision-works access points generate near-continuous demand for construction traffic-management plans, with Transport for NSW conditions on Bringelly Road requiring particularly robust work-zone treatments given its role as a primary regional connector.
FAQ
Swept Path Analysis — common questions
What standards do your traffic management documents follow?
In NSW, temporary traffic management documents are prepared to the Transport for NSW Traffic Control at Work Sites (TCAWS) manual, which supplements Australian Standard AS 1742.3 (traffic control for works on roads). Swept-path and vehicle-access checks reference the AS 2890 series and Austroads design vehicles. We prepare TGS and TMP documents to these current standards through PWZTMP-accredited designers.
What is a Traffic Guidance Scheme (TGS)?
A TGS is a site-specific, to-scale diagram that shows exactly where every advance-warning sign, cone, barrier, taper and traffic controller goes around a work zone or event. In NSW it replaced the older term Traffic Control Plan (TCP), and a compliant TGS is drawn to the TfNSW TCAWS manual and AS 1742.3.
Who is legally allowed to prepare a TGS or TMP in NSW?
Only a person holding the SafeWork NSW Prepare a Work Zone Traffic Management Plan (PWZTMP) accreditation can legally design or modify a TGS or TMP, and a compliant TGS carries the accredited designer's name and TfNSW certification details. On the road, Traffic Controller (TCR) card-holders direct traffic and Traffic Plan Implementer (IMP) card-holders set up and pack down the scheme — different cards for different jobs.
Get in touch
Need swept path analysis in Leppington?
Tell us about the site, the dates and what you need — we'll come back with a plan.