Meadowbank · Northern Suburbs
We handle swept path analysis in Meadowbank, from the first plan to the final pack-down. Meadowbank Station access, Shepherds Bay urban renewal, Victoria Road / Meadowbank Bridge. Schemes are designed for the real road environment, approved by the right authorities and delivered safely.
What's included
AutoTURN and Vehicle Tracking checks against AS 2890 and Austroads design vehicles, for everything from B-doubles to refuse trucks. Swept path checks for Meadowbank confirm that service vehicles, B-doubles and refuse trucks can access and turn within the site to AS 2890 and Austroads. See the full Swept Path Analysis service, or browse all traffic management in Meadowbank.
Traffic management in Meadowbank
Meadowbank Station and the Shepherds Bay urban renewal precinct are reshaping the suburb's road network as new residential towers and mixed-use development bring substantially more pedestrian and vehicle activity to the Victoria Road and Meadowbank Bridge corridor. Construction traffic management for multiple concurrent development sites must be carefully coordinated to prevent construction vehicles conflicting with the commuter and bus flows that use the bridge as a major cross-river connection.
FAQ
Swept Path Analysis — common questions
What standards do your traffic management documents follow?
In NSW, temporary traffic management documents are prepared to the Transport for NSW Traffic Control at Work Sites (TCAWS) manual, which supplements Australian Standard AS 1742.3 (traffic control for works on roads). Swept-path and vehicle-access checks reference the AS 2890 series and Austroads design vehicles. We prepare TGS and TMP documents to these current standards through PWZTMP-accredited designers.
What is a Traffic Guidance Scheme (TGS)?
A TGS is a site-specific, to-scale diagram that shows exactly where every advance-warning sign, cone, barrier, taper and traffic controller goes around a work zone or event. In NSW it replaced the older term Traffic Control Plan (TCP), and a compliant TGS is drawn to the TfNSW TCAWS manual and AS 1742.3.
Who is legally allowed to prepare a TGS or TMP in NSW?
Only a person holding the SafeWork NSW Prepare a Work Zone Traffic Management Plan (PWZTMP) accreditation can legally design or modify a TGS or TMP, and a compliant TGS carries the accredited designer's name and TfNSW certification details. On the road, Traffic Controller (TCR) card-holders direct traffic and Traffic Plan Implementer (IMP) card-holders set up and pack down the scheme — different cards for different jobs.
Get in touch
Need swept path analysis in Meadowbank?
Tell us about the site, the dates and what you need — we'll come back with a plan.