St Peters · Inner South

Traffic Consultants delivers traffic guidance schemes across St Peters and the wider Inner South. Princes Highway, Canal Road and WestConnex M8 tunnel portal construction zone. We prepare the documentation, obtain the permits and put accredited people on site.

What's included

AS 1742.3 / TCAWS compliant Prepared by PWZ-accredited designers Rapid turnaround

Site-specific, to-scale schemes (formerly TCPs) showing every sign, taper and controller — compliant and approval-ready. In St Peters the scheme has to suit real lane widths and movements, so we design to AS 1742.3 and the TCAWS for the specific site. See the full Traffic Guidance Schemes service, or browse all traffic management in St Peters.

Traffic management in St Peters

St Peters sits at the heart of WestConnex, with the M8 tunnel portal and associated surface works fundamentally reshaping Princes Highway and Canal Road through ongoing construction activity. The concentration of tunnel ventilation infrastructure, ramp tie-ins and local road realignments makes this one of the most technically demanding construction-zone traffic environments in New South Wales, requiring continuous flagging, variable speed management and community impact mitigation.

Get in touch

Need traffic guidance schemes in St Peters?

Tell us about the site, the dates and what you need — we'll come back with a plan.