Sydney CBD · Sydney CBD & City
Planning swept path analysis in Sydney CBD? Traffic Consultants designs the scheme, secures the approvals and runs the crews on the road. George St light-rail spine, Circular Quay and The Rocks closures, plus citywide NYE, Vivid and Anzac Day events. That's the kind of local road environment we plan around across the Sydney CBD & City.
What's included
AutoTURN and Vehicle Tracking checks against AS 2890 and Austroads design vehicles, for everything from B-doubles to refuse trucks. In Sydney CBD we run AutoTURN and Vehicle Tracking checks so access, loading and docks work for the intended design vehicles. See the full Swept Path Analysis service, or browse all traffic management in Sydney CBD.
Traffic management in Sydney CBD
Sydney's CBD demands the most layered traffic management in the state, with George Street's light-rail corridor requiring precision coordination alongside dense pedestrian flows and frequent lane occupancies for utility and construction works. Circular Quay and The Rocks draw mass crowds for Vivid Sydney, New Year's Eve and Anzac Day commemorations, necessitating staged road closures, delineation, and pedestrian diversion schemes that integrate with Transport for NSW's real-time network management.
FAQ
Swept Path Analysis — common questions
What standards do your traffic management documents follow?
In NSW, temporary traffic management documents are prepared to the Transport for NSW Traffic Control at Work Sites (TCAWS) manual, which supplements Australian Standard AS 1742.3 (traffic control for works on roads). Swept-path and vehicle-access checks reference the AS 2890 series and Austroads design vehicles. We prepare TGS and TMP documents to these current standards through PWZTMP-accredited designers.
What is a Traffic Guidance Scheme (TGS)?
A TGS is a site-specific, to-scale diagram that shows exactly where every advance-warning sign, cone, barrier, taper and traffic controller goes around a work zone or event. In NSW it replaced the older term Traffic Control Plan (TCP), and a compliant TGS is drawn to the TfNSW TCAWS manual and AS 1742.3.
Who is legally allowed to prepare a TGS or TMP in NSW?
Only a person holding the SafeWork NSW Prepare a Work Zone Traffic Management Plan (PWZTMP) accreditation can legally design or modify a TGS or TMP, and a compliant TGS carries the accredited designer's name and TfNSW certification details. On the road, Traffic Controller (TCR) card-holders direct traffic and Traffic Plan Implementer (IMP) card-holders set up and pack down the scheme — different cards for different jobs.
Get in touch
Need swept path analysis in Sydney CBD?
Tell us about the site, the dates and what you need — we'll come back with a plan.