Tempe · Inner South
We handle traffic management plans in Tempe, from the first plan to the final pack-down. Princes Highway, Tempe Reserve and Cooks River shared-path access management. Schemes are designed for the real road environment, approved by the right authorities and delivered safely.
What's included
TMPs and Construction TMPs written to meet your development consent and get through assessment without rounds of back-and-forth. A TMP in Tempe ties the works to your development consent and the surrounding Inner South road network, ready for the authorities to review. See the full Traffic Management Plans service, or browse all traffic management in Tempe.
Traffic management in Tempe
The Princes Highway through Tempe is a state road with strict lane-occupancy restrictions, making any kerb, median, or footpath works highly complex from a traffic-management perspective. Tempe Reserve and the Cooks River shared path attract pedestrians and cyclists who cross the highway at several points, so pedestrian-management plans and temporary crossing treatments are commonly required alongside standard work-zone controls for infrastructure projects in the area.
FAQ
Traffic Management Plans — common questions
What's the difference between a TGS, a TMP and a CTMP?
A TMP is the high-level document that explains why and how a project affects the road network and sets the controls; a TGS is the diagram showing where each device and controller is placed and usually sits inside the TMP; a CTMP is a TMP written for a construction site and is commonly a condition of a Development Approval. The TMP says why and how, the TGS shows exactly where, and a CTMP is the construction version of a TMP.
Do I need a Traffic Management Plan for my project or event?
You generally need a TMP or CTMP whenever works or an event will affect how traffic, pedestrians or cyclists move on a public road — for example lane or road closures, footpath closures, or construction traffic entering a busy street. For construction a CTMP is frequently a condition of development consent; for events a TMP is required if you're closing or significantly affecting public roads. If unsure, a quick site review will confirm which document your job needs.
Who is legally allowed to prepare a TGS or TMP in NSW?
Only a person holding the SafeWork NSW Prepare a Work Zone Traffic Management Plan (PWZTMP) accreditation can legally design or modify a TGS or TMP, and a compliant TGS carries the accredited designer's name and TfNSW certification details. On the road, Traffic Controller (TCR) card-holders direct traffic and Traffic Plan Implementer (IMP) card-holders set up and pack down the scheme — different cards for different jobs.
What standards do your traffic management documents follow?
In NSW, temporary traffic management documents are prepared to the Transport for NSW Traffic Control at Work Sites (TCAWS) manual, which supplements Australian Standard AS 1742.3 (traffic control for works on roads). Swept-path and vehicle-access checks reference the AS 2890 series and Austroads design vehicles. We prepare TGS and TMP documents to these current standards through PWZTMP-accredited designers.
Get in touch
Need traffic management plans in Tempe?
Tell us about the site, the dates and what you need — we'll come back with a plan.