Traffic Consultants delivers construction traffic management across Northern Beaches and the wider Northern Beaches. The Pittwater Rd spine and Spit Bridge / Military Rd clearway pinch points. We prepare the documentation, obtain the permits and put accredited people on site.
What's included
Work-zone traffic, lane and road closures, and pedestrian management for civil and building works. We write the Construction Traffic Management Plan your consent requires, then put crews on site to run it. Work-zone traffic in Northern Beaches covers lane and road closures, site access and pedestrian protection, all to the TCAWS and your consent conditions. See the full Construction Traffic Management service, or browse all traffic management in Northern Beaches.
Traffic management in Northern Beaches
The Northern Beaches road network is defined by its single spine along Pittwater Road and the notorious pinch points at Spit Bridge and the Military Road corridor, where clearway regimes and bridge openings already strain capacity. Coastal events, surf carnivals, and construction works along this corridor require traffic-management plans that account for limited detour options, high pedestrian volumes at beach precincts, and strict council and Transport for NSW permit conditions.
FAQ
Construction Traffic Management — common questions
Do I need a Traffic Management Plan for my project or event?
You generally need a TMP or CTMP whenever works or an event will affect how traffic, pedestrians or cyclists move on a public road — for example lane or road closures, footpath closures, or construction traffic entering a busy street. For construction a CTMP is frequently a condition of development consent; for events a TMP is required if you're closing or significantly affecting public roads. If unsure, a quick site review will confirm which document your job needs.
What's the difference between a TGS, a TMP and a CTMP?
A TMP is the high-level document that explains why and how a project affects the road network and sets the controls; a TGS is the diagram showing where each device and controller is placed and usually sits inside the TMP; a CTMP is a TMP written for a construction site and is commonly a condition of a Development Approval. The TMP says why and how, the TGS shows exactly where, and a CTMP is the construction version of a TMP.
What is a Road Occupancy Licence (ROL) and when do I need one?
A Road Occupancy Licence is formal Transport for NSW approval to occupy or affect the state (classified) road network. You generally need one to work on a state road, within 100 m of traffic signals, or wherever works affect traffic flow, queues or safety on a state road. Council-controlled local roads are approved by the council instead, and the ROL application must match your TGS.
Why was a generic or template traffic plan rejected by council?
Generic templates are one of the most common reasons councils reject a submission, because they don't show the real site-specific detail — exact clearances, bus zones, driveways, fire hydrants, school-crossing locations and local constraints. NSW councils require a plan drawn for your specific site by an accredited designer to TCAWS and AS 1742.3, so replacing a template with a site-specific TGS is usually what gets an application approved.